What To Expect

DESIGN CONSULTATION

We take meeting with our prospective clients very seriously. We spend from 1 to 2 hours on our first meeting, including measuring the house and back yard and evaluating access and other variables for construction. Next, we will listen to your needs and wants, provide you budget numbers, and gather information for our 3D design.

The second meeting consists of our presentation of a custom 3D design on our laptops in your home. Assuming the design is approved, we provide final design and proposal documents, followed up by color selections, pool and permit paperwork documents.

FINANCING

We provide several options to our customers for custom pool financing.

TIMING OF CONSTRUCTION

After all the pool and permit documents are initialed, we drop off the permits. Depending on the county or municipality permits can take from 1 to 4 weeks.

After we have the permit in our hands we schedule the layout, dig and steel crew. As soon as we dig the pool, we start our stopwatch. Depending on the pool project size and options, we will have water running into your new pool within 4 to 8 weeks from the initial pool dig.

As soon as the pool is full, we will immediately start the pool pumps running and go through a thorough punch list to get your new pool ready to swim. Finally, we turn over the keys and take you through our time-tested Pool School..

WARRANTY

We only use the best of the best pool equipment – StaRite pumps, filters, heaters, lights, automation, and salt chlorine generators. All of our equipment comes with a manufacturer’s exclusive 3 year warranty. Any issues with the equipment will be repaired or replaced at no cost within 3 years from your pool start up.